Choosing the right generator size is the single most important decision in your purchase. Get it wrong, and you face either frequent overloads (and shutdowns) or wasted capital on capacity you will never use. This guide gives you the exact calculation method engineers use—not guesswork.
Korak 1: Identify Your Critical Loads
List every device or system that must run during a power outage. These are your critical loads. For a typical commercial facility, that includes lighting, HVAC, sigurnosti, informatička oprema, and process machinery.
Read the nameplate rating (in watts or amps) for each device. If only amps are available: Watts = Volts × Amps. For three-phase equipment: Watts = Volts × Amps × 1.732 × Power Factor.
| Device | Trčanje Wattsa | Pokretanje Wattsa | Bilješke |
|---|---|---|---|
| LED rasvjeta (50 fixtures) | 500 | 500 | No surge |
| HVAC System (10-tona) | 12,000 | 36,000 | 6x surge for compressor |
| Server Rack | 3,000 | 3,000 | UPS handles ride-through |
| Security System | 500 | 500 | Always-on |
| Elevator (20 HP) | 15,000 | 75,000 | High starting current |
Korak 2: Calculate Running vs. Starting Power
You need two numbers:
- Radni kW: Sum of all loads’ tekući vati, podijeljeno sa 1000.
- Početni kVA: The largest motor’s starting kVA (typically 4-6x its running kVA) plus the sum of all others’ running kVA.
The generator must satisfy both numbers. Primjer: 30kW running total + 40kW starting surge = 50kW (62.5kVA) minimum generator.
Korak 3: Apply Safety Margins
Never size exactly to your load. Industry best practice adds:
- 25% future expansion margin — you will add equipment later
- 10% altitude derating if above 1000m / 3280ft
- 10% temperature derating for ambient above 40°C / 104°F
Final formula: Veličina generatora (kVA) = (Total Running kW × 1.25) ÷ 0.8
For a detailed walkthrough with downloadable calculator, see our Generator Sizing Guide.
Common Sizing Mistakes
- Zanemarivanje struje pokretanja motora — motors draw 4-6x running current at startup
- Using nameplate kVA instead of kW — critical for engine loading calculations
- Forgetting power factor differences — UPS systems have harmonic loads that affect Dimenzioniranje generatora
- Adding 100% redundancy unnecessarily — N+1 for critical, standalone for non-critical
FAQ">FAQ
How do I size a generator for motor loads?
Multiply the largest motor’s running kVA by 4-6 (depending on starting method) and add the sum of all other loads. For soft-start motors, use 2-3x. For VFD-driven motors, use 1.5x.
Što je 80% rule for generator sizing?
Generatori should operate at 70-80% of rated capacity for optimal fuel efficiency. Sizing to 100% continuous load is not recommended for diesel engines as it accelerates carbon buildup.
Can I use a generator sizing calculator online?
Da. Many manufacturers provide free sizing tools. Međutim, always validate the results with a licensed electrical engineer for critical applications.
Related Resources
- Diesel Generator Fuel Consumption Guide
- Diesel Generator Price Guide
- Generator Sizing Guide
- kW vs kVA: What’s the Difference
- 1000kVA Generator
- 100kVA Generator Specs
⚡ Istražite srodna rješenja
- 🏭 500kW Diesel Generator
- 🏭 1000kW Diesel Generator
- 🏭 500kW YC dizel generator
- 🔧 KMS (Cummins/Doosan) Niz
- 📋 Dizel generatorski setovi
- 📋 Proces narudžbe — Kako kupiti
- 📋 Kontaktirajte nas
💡 Trebate prilagođeno rješenje? Kontaktirajte naš inženjerski tim za preporuke specifične za projekt.