Choosing the right generator size is the single most important decision in your purchase. Get it wrong, and you face either frequent overloads (and shutdowns) or wasted capital on capacity you will never use. This guide gives you the exact calculation method engineers use—not guesswork.
Paso 1: Identify Your Critical Loads
List every device or system that must run during a power outage. These are your critical loads. For a typical commercial facility, that includes lighting, climatización, seguridad, equipo de TI, and process machinery.
Read the nameplate rating (in watts or amps) for each device. If only amps are available: Vatios = Voltios × Amperios. For three-phase equipment: Watts = Volts × Amps × 1.732 × Power Factor.
| Device | Vatios corrientes | Vatios iniciales | Notas |
|---|---|---|---|
| LED Lighting (50 fixtures) | 500 | 500 | Sin aumento |
| Sistema de climatización (10-tonelada) | 12,000 | 36,000 | 6x surge for compressor |
| Server Rack | 3,000 | 3,000 | UPS handles ride-through |
| Security System | 500 | 500 | Always-on |
| Elevator (20 caballos de fuerza) | 15,000 | 75,000 | High starting current |
Paso 2: Calculate Running vs. Starting Power
You need two numbers:
- kW en funcionamiento: Sum of all loads’ vatios de funcionamiento, dividido por 1000.
- kVA de arranque: The largest motor’s starting kVA (typically 4-6x its running kVA) plus the sum of all others’ running kVA.
The generator must satisfy both numbers. Ejemplo: 30kW running total + 40kW starting surge = 50kW (62.5kVA) minimum generator.
Paso 3: Apply Safety Margins
Never size exactly to your load. Industry best practice adds:
- 25% future expansion margin — you will add equipment later
- 10% altitude derating if above 1000m / 3280pie
- 10% temperature derating for ambient above 40°C / 104°F
Final formula: Tamaño del generador (kVA) = (Total Running kW × 1.25) ÷ 0.8
For a detailed walkthrough with downloadable calculator, see our Guía de dimensionamiento del generador.
Common Sizing Mistakes
- Ignorar la corriente de arranque del motor — motors draw 4-6x running current at startup
- Using nameplate kVA instead of kW — critical for engine loading calculations
- Forgetting power factor differences — UPS systems have harmonic loads that affect Dimensionamiento del generador
- Adding 100% redundancy unnecessarily — N+1 for critical, standalone for non-critical
Preguntas frecuentes">Preguntas frecuentes
How do I size a generator for motor loads?
Multiply the largest motor’s running kVA by 4-6 (depending on starting method) and add the sum of all other loads. For soft-start motors, use 2-3x. For VFD-driven motors, use 1.5x.
cual es el 80% rule for generator sizing?
Generadores should operate at 70-80% of rated capacity for optimal fuel efficiency. Sizing to 100% continuous load is not recommended for diesel engines as it accelerates carbon buildup.
Can I use a generator sizing calculator online?
Sí. Many manufacturers provide free sizing tools. Sin embargo, always validate the results with a licensed electrical engineer for critical applications.
Related Resources
- Diesel Generator Fuel Consumption Guide
- Diesel Generator Price Guide
- Guía de dimensionamiento del generador
- kW vs kVA: What’s the Difference
- 1000Generador kVA
- 100kVA Generator Specs
⚡ Explorar soluciones relacionadas
- 🏭 500Generador diésel kW
- 🏭 1000Generador diésel kW
- 🏭 500Generador diésel kW YC
- 🔧 kms (Cummins/Doosan) Serie
- 📋 Grupos electrógenos diésel
- 📋 Proceso de pedido: cómo comprar
- 📋 Contáctenos
💡 Necesita una solución personalizada? Póngase en contacto con nuestro equipo de ingeniería para recomendaciones específicas del proyecto.