发电机选型: How to Calculate Power Needs for Your Facility.

Choosing the right generator size is the single most important decision in your purchase. Get it wrong, and you face either frequent overloads (and shutdowns) or wasted capital on capacity you will never use. This guide gives you the exact calculation method engineers use—not guesswork.

步 1: Identify Your Critical Loads

List every device or system that must run during a power outage. These are your critical loads. For a typical commercial facility, that includes lighting, 暖通空调, 安全, 信息技术设备, and process machinery.

Read the nameplate rating (in watts or amps) for each device. If only amps are available: 瓦特 = 伏特 × 安培. For three-phase equipment: Watts = Volts × Amps × 1.732 × Power Factor.

Device运行瓦数起始瓦数笔记
LED照明 (50 fixtures)500500No surge
HVAC System (10-吨)12,00036,0006x surge for compressor
Server Rack3,0003,000UPS handles ride-through
Security System500500Always-on
Elevator (20 惠普)15,00075,000High starting current

步 2: Calculate Running vs. Starting Power

You need two numbers:

  • 运行功率: Sum of all loads’ 运行瓦数, 除以 1000.
  • 启动千伏安: The largest motor’s starting kVA (typically 4-6x its running kVA) plus the sum of all othersrunning kVA.

The generator must satisfy both numbers. 例子: 30kW running total + 40kW starting surge = 50kW (62.5千伏安) minimum generator.

步 3: Apply Safety Margins

Never size exactly to your load. Industry best practice adds:

  • 25% future expansion margin — you will add equipment later
  • 10% altitude derating if above 1000m / 3280英尺
  • 10% temperature derating for ambient above 40°C / 104°F

Final formula: 发电机尺寸 (千伏安) = (Total Running kW × 1.25) ÷ 0.8

For a detailed walkthrough with downloadable calculator, see our 发电机选型指南.

常见尺码错误

  • 忽略电机启动电流 — motors draw 4-6x running current at startup
  • Using nameplate kVA instead of kW — critical for engine loading calculations
  • Forgetting power factor differences — UPS systems have harmonic loads that affect 发电机选型
  • Adding 100% redundancy unnecessarily — N+1 for critical, standalone for non-critical

常问问题">常问问题

How do I size a generator for motor loads?

Multiply the largest motor’s running kVA by 4-6 (depending on starting method) and add the sum of all other loads. For soft-start motors, use 2-3x. For VFD-driven motors, use 1.5x.

什么是 80% rule for generator sizing?

发电机 should operate at 70-80% of rated capacity for optimal fuel efficiency. Sizing to 100% continuous load is not recommended for diesel engines as it accelerates carbon buildup.

Can I use a generator sizing calculator online?

是的. Many manufacturers provide free sizing tools. 然而, always validate the results with a licensed electrical engineer for critical applications.