< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=818233107660385&ev=PageView&noscript=1" />
x
Send Your Inquiry Today
Quick Quote

Generator Sizing Hub | Application Guides

Generator Sizing by Application

Correct generator sizing is critical for reliability, efficiency, and code compliance.
Undersizing causes overload; oversizing wastes capital. This hub provides application-specific sizing guides.

ApplicationTypical PowerKey Factor
Hospital/Medical500kW-2000kWN+1 redundancy
Data Center1000kW-5000kW2N redundant
Manufacturing200kW-1500kWMotor starting
Construction50kW-500kWPortable
Mining500kW-3000kWAltitude derating

The 5-Step Sizing Process

  1. Load Inventory: List all electrical loads with starting kVA
  2. Apply Diversity Factor: Not all loads run simultaneously (0.7-0.9)
  3. Select Power Rating: Prime vs Standby vs Continuous
  4. Apply Derating: Altitude, temperature, humidity corrections
  5. Add Margin: 10-20% future expansion

Common Sizing Mistakes

  • Matching nameplate: Motors have 6-8x inrush, requiring 3x generator kVA
  • Ignoring Power Factor: Low PF (0.6) requires larger generator
  • No redundancy: Critical apps need N+1 (hospital, data center)
  • Skipping derating: High altitude requires 3-5% power reduction per 300m

For a personalized sizing analysis, contact our engineering team.