发电机选型 by Application
Correct generator sizing is critical for reliability, 效率, and code compliance.
Undersizing causes overload; oversizing wastes capital. This hub provides application-specific sizing guides.
| 应用 | Typical Power | Key Factor |
|---|---|---|
| Hospital/Medical | 500kW-2000kW | N+1 redundancy |
| 数据中心 | 1000kW-5000kW | 2N redundant |
| 制造业 | 200kW-1500kW | 电机启动 |
| 建造 | 50千瓦-500千瓦 | 便携的 |
| 矿业 | 500千瓦-3000千瓦 | Altitude derating |
The 5-Step Sizing Process
- Load Inventory: List all electrical loads with starting kVA
- Apply Diversity Factor: Not all loads run simultaneously (0.7-0.9)
- Select Power Rating: Prime vs Standby vs Continuous
- Apply Derating: 高度, 温度, humidity corrections
- Add Margin: 10-20% future expansion
常见尺码错误
- Matching nameplate: Motors have 6-8x inrush, requiring 3x generator kVA
- Ignoring 功率因数: Low PF (0.6) requires larger generator
- No redundancy: Critical apps need N+1 (医院, 数据中心)
- Skipping derating: High altitude requires 3-5% power reduction per 300m
For a personalized sizing analysis, 联系我们的工程团队.