发电机组安装步骤

哈萨克斯坦 18 MW燃气发电机组余热回收项目背景

如果您购买发电机组后不知道如何安装, I will now provide you with detailed
installation steps and precautions for the generator set.Preparation work for installation of generator sets, 现场注意事项,
和简单的故障排除.

伴生石油 <a href=气体发生器 设置0" 宽度="1920" 高度="700" />1Preparation work to determine the working environment of the generator set: fixed foundation, 空间,
通风, and protection
1. The place where the generator set is installed should ensure a flat concrete ground, measure the bearing capacity and size.
2. You should reserve sufficient space at the location where you install the generator set, and the distance from the power
generation to the wall should not be less than 1.5 米.
If your generator set is installed with windows at both the indoor air inlet and outlet to ensure smooth ventilation.Because
prolonged high-temperature operation affects the lifespan of the generator set.
4. 在经常出现风沙的地区,发电机组还应配备专业的防沙空气过滤装置。
沙尘暴.
2发电机组现场施工准备
1. 发电机组运至现场时提前准备好吊车或叉车卸货机械.
2. 您还需要根据现场情况准备电缆。我们没有为您的负载设备准备发电机组
发货时, 所以这个距离的线缆需要我们自己购买.
3. 准备补充燃油等消耗品, 防冻液, 和发动机油作为测试装置的必备项目。所有这些都是
不适合工厂化生产.
4. 现场安装通风管道.
3提前熟悉发电机组的操作
1. 请提前联系经销商获取本机的操作说明, 熟悉基本操作并
启动、关闭等原理.
2. 控制界面参数查看: 数据参数,例如电流, 电压, 负载功率, ETC.
3. 视频 关于添加和更换机油和防冻液.
4. 了解发电机组铭牌, 输出功率, 额定功率, 以及是否满足您的需求.
4发电机组的调试和测试
1. 一切安装完毕后, 检查发电机组连接电缆是否松动, 以及是否有泄漏
在燃料中, 防冻液, ETC. 进行全面检查.
2.确认没有问题后, 启动发电机组进行空载测试,检查电压、频率是否符合要求
您的负载设备的要求.
3. 如果初始启动测试没有问题, 即可带负载开始使用。一般发电机组长期运行最适合的状态是80%负载, 100% 负载不超过 1 小时, 和 120% 负载仅用于短期使用.

<a href=发电机-0" 宽度="1920" 高度="700" />
5常见安装故障排除
1. 启动失败, 电池故障
如果您购买的发电机组在运输过程中电池电量下降长达 20 天, 和第一个
启动不成功, 您可以使用电气设备检查电池是否电量不足, 然后按照
情况.
2. 由于进气管空气故障导致启动失败
首次启动时需排空燃油管路中的空气, 而长期放弃发电机组也有
这个错误.
3. 设备未带负荷运行引起的电气故障
If the generator set you purchased is three-phase, 连接负载设备时, 有必要确定是否
线路的相位连续性与负载相同.
6发电机组的操作和维护
1. 查阅使用说明书,清楚了解发电机组的保养周期
2. 了解机油和防冻液的保质期和更换周期
3. 培训用户日常检查工作带, 操作声音, 和累计发电量.