x
Send Your Inquiry Today
Quick Quote
Slide
HuaQuan Power
With over 15 years of expertise in the generator set industry, we have accumulated rich production experience.
previous arrow
next arrow

Main Business

We provide global power solutions to companies around the world. Diesel generator set, gas generator set, energy storage station, flood control pump, box-type substation, and light tower generator.
01
Generator Set
Generator Set
Diesel & Gas Generator Sets (1kW-3000kW), providing all kinds of power solutions as follows: Common Sets, Soundproof Sets, Vehicle/Trailer-mounted, and Containerized Mobile Power Plants.
02
Flood Control Water Pump Set
Flood Control Water Pump Set
Compatible with firefighting, irrigation and flood controlling pumps, with optional mobile trailers and smart protection devices.
03
Energy Storage Power Station
Energy Storage Power Station
Data Centers, Industrial Power Supply, Tourism Facilities Power, and PV Storage Projects (1kW-500kW)
04
Compact Substation
Compact Substation
Aesthetic substation, transformers, distribution cabinets, fixed separate switchgears (GDD Type).

About Us

Huaquan Power was established in 2010, with its headquarters in Weifang City. Pursuing the mission “Powering a Greener World”, Huaquan provides power generation equipment, renewable energy storage systems, high/low voltage switchgears, and EPC power solutions through three brands globally: HQ-POWER®, HUAQUAN®, and 华全®. The company is a world leader with over 1 million devices sold worldwide.

About Us
Generator Set Annul Sales
10000 +
Annual sales revenue of generator sets
Serving Countries and Regions
270 +
Serving Countries and Regions
Global Service Centers
1000 +
Global Service Centers
Professionals
1000 +
Professionals

Strictly Meet the Professional Standards

Huaquan Power continues to enhance its global competitiveness through quality, value-added service and technology innovation.
Physically inspecting components and products (incoming, in-process, pre-shipment) for generator sets, implementing self-checks/error-prevention during assembly with traceable images, and utilizing a CRM global feedback loop to continuously improve quality standards.
Adopting an "internal customer" approach to foster cross-departmental quality collaboration, performing root cause analysis with enhanced "Dual-Verification" training for standardization, and managing real-time production-floor quality metrics to drive awareness and knowledge sharing.
To dynamically optimize satisfaction, we track real-time KPIs (NPS, CES, etc.), implement in-process quality control with visual accountability, and leverage global CRM feedback for continuous refinement.

Huaquan Generator Set Ordering Process

Submit Your Project Requirements
Clearly define your procurement needs, including the required equipment type (diesel generator set, gas generator set, or energy storage system) and the specific application scenario.
Confirm Layout and Technical Parameters
Based on the design blueprints or site requirements you provide, we will confirm the product's specific power rating, performance parameters, and layout design.
Place Order and Production Scheduling
Upon signing the official contract, a down payment is required. We will then immediately initiate the production process. The estimated production lead time is approximately 15 to 30 working days.
Delivery and Installation
Once manufacturing is complete, you are invited to perform the pre-shipment inspection. Upon your confirmation and final balance payment, we will arrange immediate shipment and provide subsequent on-site installation guidance.

HUAQUAN Team

Huaquan earns your enduring trust through the unwavering dedication of our core team in the generator set industry.
Group Chairman – Zhao Lizeng
Group Chairman – Zhao Lizeng
Mr. Zhao Lizeng, founder and current Chairman of Huaquan Power, has pioneered research on transitioning product management into corporate governance, with particular expertise in establishing product manager roles within enterprise marketing systems.
Process and Production Engineer – Song Chunlong
Process and Production Engineer – Song Chunlong
Multiskilled Workshop Coordinator: Optimizing processes and coordinating resources to ensure efficient production of power generator units, leveraging expertise for on-schedule delivery of every product.
R&D Engineer – Zhao Xinchong
R&D Engineer – Zhao Xinchong
R&D Specialist: Transforming designs into reliable generator systems by resolving engineering bottlenecks via code-driven solutions and rigorous testing.
Quality Control Engineer – Li Shubai
Quality Control Engineer – Li Shubai
Quality Assurance Specialist: Meticulously inspecting defects and rigorously testing to safeguard the final integrity of power generator units before delivery.

Client Endorsements on HUAQUAN Generator Sets

Premium Partnership Network, Global Acclaim from Distributors, Value-Driven Service Commitment.
  • Mr. Techov, CEO of InnoTech Indonesia
    "Becoming a Huaquan distributor of generator sets since our encounter at a 2020 industry forum has generated RMB 200 million in revenue growth. Their 24/7 technical support and predictive maintenance set industry benchmarks."
    Mr. Techov, CEO of InnoTech Indonesia
  • Director Habib, Uzbekistan Cement Group
    “Selecting Huaquan's standby generator sets for our cement plant's power system in 2023 has maintained continuous production without unplanned downtime to date.”
    Director Habib, Uzbekistan Cement Group

HUAQUAN Highlight Projects

Kazakhstan First 3MW Waste Heat Recovery Project of Huaguan Gas Power Station
Kazakhstan First 3MW Waste Heat Recovery Project of Huaguan Gas Power Station
Coal Mine Application Huaguan 2400KW High-Voltage Parallel System Provides High-Voltage Power Supply for Mining Operations
Coal Mine Application Huaguan 2400KW High-Voltage Parallel System Provides High-Voltage Power Supply for Mining Operations
10.5kV High-Voltage Generator Sets Installed for Data Center Power Protection​
10.5kV High-Voltage Generator Sets Installed for Data Center Power Protection​
Installation and Commissioning of 5 × 500kW Diesel Generator Sets for Poultry Farm
Installation and Commissioning of 5 × 500kW Diesel Generator Sets for Poultry Farm
Installation and Commissioning of 3 Gas Generator Sets for Myanmar Client​
Installation and Commissioning of 3 Gas Generator Sets for Myanmar Client​
Installation and Commissioning of 10 × 300kW Gas Generator Sets with Waste Heat Recovery System for Vietnam Project​
Installation and Commissioning of 10 × 300kW Gas Generator Sets with Waste Heat Recovery System for Vietnam Project​
Fishery - Photovoltaic Complementary Project
Fishery - Photovoltaic Complementary Project
Integrated Energy Management Project of 1.3MW Photovoltaic + PV-Storage-Diesel Microgrid in Ecological Aquaculture Industrial Park
Integrated Energy Management Project of 1.3MW Photovoltaic + PV-Storage-Diesel Microgrid in Ecological Aquaculture Industrial Park
Environmental Adaptation Engineering

Customized generator sets’ solutions based on operational country conditions (temp/air quality/humidity):

  • Arctic zones: Engine pre-heating systemsfor generator set (-30℃ starting)
  • Outdoor installations: IP55 rated rain shelters
  • Desert operations: Multi-stage desert air filters
Operational Mode Selection

Power system recommendations by usage profile:

  • Prime Power(>8h/day continuous): Industrial-grade generator sets
  • Standby Power(<500h/year): Cost-optimized configurations
Global Service Assurance

For high-utilization scenarios:

  • Prioritize brands with local service networks
  • Supply Critical Spare Kitsfor generator sets (filters/seals/wear parts)
  • Provide Preventive Maintenance Guidesof generator sets(ISO 8528-9 compliant)
Pump Selection Protocol

Determined by fluid characteristics:

  • Q-H curve matching
  • Medium analysis(solid content/corrosivity/viscosity)
  • Application-specific pumps: Clean water/Sewage/Chemical-resistant
International Warranty Protocol
  • Remote Diagnostics First: Initial troubleshooting via WeChat/AR tools resolves 50% issues in real-time
  • Localized Service Dispatch: Unresolved cases trigger on-site response by authorized agents within 48 hours (106-country coverage)
  • Express Warranty Parts Delivery: Genuine parts airmailed via DHL to designated locations (7-day guarantee)
  • Certified Repair Execution: Repairs performed by factory-certified local technicians with video documentation
Quick Quote

Get Real-Time Quotes for the Latest Projects

Just provide specific requirements, and we will provide you with optimization suggestions and one-on-one dedicated customer service throughout the process.